论文 论著 |
本人以构建清洁低碳、安全高效能源体系的国家重大战略需求为导向,长期致力于碳中和背景下大规模水电系统优化调度和水火风光储多能互补的基础理论和关键技术研究。目前以第一或通讯作者身份在《Applied Energy》、《Energy Conversion and Management》、《Energy》、《Journal of Hydrology》、《水科学进展》等行业权威期刊上发表/录用学术论文30余篇,其中SCI收录25篇(中科院1区论文14篇,2区论文8篇),EI收录论文5篇,中文核心论文5篇。代表性论文如下: 1)Chengguo Su, Chuntian Cheng*, Peilin Wang, Jianjian Shen, Xinyu Wu. Optimization model for long-distance integrated transmission of wind farms and pumped-storage hydropower plants[J]. Applied Energy, 2019, 242:285-293. (SCI,中科院 1区,IF=11.446) 2)Chengguo Su, Wenlin Yuan*, Chuntian Cheng, Peilin Wang, Lifei Sun, Taiheng Zhang. Short-term generation scheduling of cascade hydropower plants with strong hydraulic coupling and head-dependent prohibited operating zones[J]. Journal of Hydrology, 2020, 591:125556. (SCI,中科院 1区,IF=6.708) 3)Lu Lu, Wenlin Yuan, Chengguo Su*, Peilin Wang, Chuntian Cheng, Denghua Yan, Zening Wu. Optimization model for the short-term joint operation of a grid-connected wind-photovoltaic-hydro hybrid energy system with cascade hydropower plants[J]. Energy Conversion and Management, 2021, 236:114055. (SCI,中科院 1区,郑州大学“三类高质量论文”TOP期刊,IF=11.533) 4)Chengguo Su, Peilin Wang*, Wenlin Yuan, Chuntian Cheng, Taiheng Zhang, Denghua Yan, Zening Wu. An MILP Based Optimization Model for Reservoir Flood Control Operation Considering Spillway Gate Scheduling[J]. Journal of Hydrology, 2022,613:128483. (SCI,中科院1区,IF=6.708) 5)Chengguo Su, Peilin Wang*, Wenlin Yuan, Yang Wu, Feng Jiang, Zening Wu, Denghua Yan. Short-term Optimal Scheduling of Cascade Hydropower Plants with Reverse-Regulating Effects[J]. Renewable Energy, 2022,199:395-406. (SCI,中科院 1区,IF=8.634) 6)Chuntian Cheng, Chengguo Su*, Peilin Wang, Jianjian Shen, Jianyu Lu, Xinyu Wu. An MILP-based model for short-term peak shaving operation of pumped-storage hydropower plants serving multiple power grids[J]. Energy, 2018, 163: 722-733. (SCI,中科院 1区,IF=8.857) 7)Wenlin Yuan, Shijie Zhang, Chengguo Su*, Yang Wu, Denghua Yan, Zening Wu. Optimal scheduling of cascade hydropower plants in a portfolio electricity market considering the dynamic water delay[J]. Energy, 2022, 252:124025. (SCI,中科院 1区,IF=8.857) 8)Peilin Wang, Wenlin Yuan, Chengguo Su*, Yang Wu, Lu Lu, DenghuaYan, Zening Wu. Short-term optimal scheduling of cascade hydropower plants shaving peak load for multiple power grids [J]. Renewable Energy, 2022, 184: 68-79. (SCI,中科院 1区,IF=8.634) 9)Wenlin Yuan, Zhe Liu, Chengguo Su*, Xinqi Wang. Photovoltaic capacity optimization of small and medium-sized hydro-photovoltaic hybrid energy systems considering multiple uncertainties[J]. Journal of Cleaner Production, 2020, 276: 124170. (SCI,中科院 1区,IF=11.072) 10)Wenlin Yuan, Xinqi Wang, Chengguo Su*, Chuntian Cheng, Zhe Liu, Zening Wu. Stochastic optimization model for the short-term joint operation of photovoltaic power and hydropower plants based on chance-constrained programming[J]. Energy, 2021, 222:119996. (SCI,中科院 1区,IF=8.857) 11)Wenlin Yuan, Wenpeng Xin, Chengguo Su*, Chuntian Cheng, Denghua Yan, Zening Wu. Cross-regional integrated transmission of wind power and pumped-storage hydropower considering the peak shaving demands of multiple power grids [J]. Renewable Energy, 2022, 190: 1112-1126. (SCI,中科院 1区,IF=8.634) 12)Na Lu, Guangyan Wang, Chengguo Su*, Zaimin Ren, Xiaoyue Peng, Quan Sui. Medium- and long-term interval optimal scheduling of cascade hydropower-photovoltaic complementary systems considering multiple uncertainties[J]. Applied Energy, 2024, 353:122085. (SCI,中科院 1区,IF=11.446) 13) 苏承国, 申建建*, 王沛霖, 周凌安, 程春田. 基于电源灵活性裕度的含风电力系统多源协调调度方法[J]. 电力系统自动化,2018,42(17):111-119.(EI) 14) 苏承国, 王沛霖, 武新宇*,程春田, 王嘉阳.考虑机组组合的梯级水电站短期调峰MILP模型[J]. 电网技术, 2018,42(6): 1883-1891.(EI) 15) 苏承国, 张俊,申建建,周华, 程春田. 考虑多级断面约束的月度火电机组组合方法[J]. 中国电机工程学报, 2018,S1:158-167. (EI) 16) 卢娜, 张佳明, 苏承国*, 胡政磊, 吴泽宁, 严登华.考虑水土互馈关系的区域水土资源联合优化配置[J]. 水科学进展, 录用待刊. (EI) 注:*表示通讯作者 |